STAGE 1 – RESIDENTIAL BUILDING WITH GARAGE AND UNDERGROUND GARAGE IN UPI V-1978, SQ. 6, M. "MALINOVA DOLINA", GR. SOFIA
STAGE 2 – RESIDENTIAL BUILDING WITH SHOPS AND UNDERGROUND GARAGE IN UPI- II-1972,1976, FL.6, M. "MALINOVA DOLINA", STUDENTSKI REGION, GR. SOFIA
STAGE 3 – TWO RESIDENTIAL BUILDINGS, UNDERGROUND GARAGE AND SHAFT SUBSTATION IN UPI VIII-1975,1976, SQUARE 54, M. "MALINOVA DOLINA", GR. SOFIA
Investor / Employer: | "FAIRPLAY PROPERTIES" REIT |
Architecture: | Architecture studio "CASTILIA" |
Main contractor: | "FAIRPLAY CONSTRUCTIONS" LTD |
BLOCK 1 (Stage 1) | |
Construction dimensions (in plan): | 41 / 19.5 m |
Floors (above ground): | 8 pcs. |
Basement levels: | 1 pc. |
Part: | Constructions; PBZ; PUSO |
RZP: | 5,200 m2 |
Strengthening a construction trench: | "Berlin" fence - concreted steel profiles with slats |
Main construction material: | monolithic reinforced concrete |
Construction system / Type of construction: | skeletal - columns, walls and "smooth" (beamless) slabs |
Construction wheelbases: | 7.2 / 6.25 m |
Foundation: | flat - foundation plate with a thickness of 70 cm |
Roof: | flat from monolithic reinforced concrete |
Degree of completion: | in operation since 2017 |
BLOCK 2 (Stage 2) | |
Construction dimensions (in plan): | 46.5 / 41.5 m |
Floors (above ground): | 8 pcs. |
Basement levels: | 1 pc. |
Part: | Constructions |
RZP: | 13,000 m2 |
Strengthening a construction trench: | 1.) "Berlin" fence - driven steel piles with piles; |
2.) poured reinforced concrete piles; | |
3.) shotcrete slope with mesh and soil nails | |
Main construction material: | monolithic reinforced concrete |
Construction system / Type of construction: | skeletal - columns, walls and "smooth" (beamless) slabs |
Construction wheelbases: | 6.4 / 6.25 m |
Foundation: | flat - foundation plate with a thickness of 70 cm |
Roof: | flat from monolithic reinforced concrete |
Degree of completion: | in operation since 2017 |
BLOCK 3 & 4 (Stage 3) | |
Construction dimensions (in plan): | 66.5 / 57.5 m |
Floors (above ground): | 6 pcs. |
Basement levels: | 1 pc. |
Part: | Constructions |
RZP: | 17,100 m2 |
Strengthening a construction trench: | "Berlin" fence - concreted steel profiles with slats |
Main construction material: | monolithic reinforced concrete |
Construction system / Type of construction: | skeletal - columns, walls and "smooth" (beamless) slabs |
Construction wheelbases: | 6.5 / 6.5 m |
Foundation: | flat - foundation plate with a thickness of 60 cm |
Roof: | flat from monolithic reinforced concrete |
Degree of completion: | in operation since 2018 |