Metrodepo Zemlane

"Project for the extension of the Metro in Sofia, Third metro line - Blvd. "Botevgradsko shose" - Blvd. "Vladimir Vazov" - Central City Part - g.k. "Ovcha Kupel", First stage - Metrodepot "Zemlyane" / "Geostroy" JSC
Investor / Employer: | Metropolitan Municipality, Metropolitan EAD |
Architecture: | BIAS-M Ltd., RGB Ltd., Konkurent 90 Ltd |
Main contractor: | Geometpo Zemlyane Association with main contractor Geoctpoy JSC and partners Tpancpemontctpoj EAD and BIAC – M EOOD |
Area: | 106,830m² |
Part: | Architecture and Constructions |
GARAGE HALL: | |
Characteristic features: | – one-story three-nave hall |
– reinforced concrete prefabricated skeletal structural system | |
– dimensions in plan – 171.5m / 67.7m | |
- clear height to the lower edge of the main beam - from 6.10m to 6.45m | |
– construction wheelbases – 12.2m / 20m, 23m and 24m | |
– roof structure – pre-stressed roof beams, pre-stressed capitals, sheet metal | |
REPAIR HALL AND BOILER ROOM: | |
Characteristic features: | – one-story and two-story two-nave hall |
– reinforced concrete prefabricated skeletal structural system | |
- dimensions in plan - 107m / 37.3m | |
ADMINISTRATIVE BUILDING: | |
Characteristic features: | – monolithic reinforced concrete, skeletal, beamless structural system |
- dimensions in plan - 48.25m / 18m | |
TRANSPORT PASSAGE: | |
Characteristic features: | - execution by open method in an unreinforced trench with slopes |
- two-hole, monolithic, closed, reinforced concrete structure - "box" type | |
– light support distance – 8.25m | |
- clear height - 4.65m | |
– the facility includes a tunnel section and two ramps | |
– total length of the facility – 168m | |
– the track development of the depot passes over the structure | |
OTHER: | – car wash |
– sink for trains | |
– gas station | |
– parking lot | |
– street network | |
Degree of completion: | in operation since 2019 |