Metrodepo Zemlane

"Project for the extension of the Metro in Sofia, Third metro line - Blvd. "Botevgradsko shose" - Blvd. "Vladimir Vazov" - Central City Part - g.k. "Ovcha Kupel", First stage - Metrodepot "Zemlyane" / "Geostroy" JSC

Investor / Employer:   Metropolitan Municipality, Metropolitan EAD
Architecture:   BIAS-M Ltd., RGB Ltd., Konkurent 90 Ltd
Main contractor:   Geometpo Zemlyane Association with main contractor Geoctpoy JSC and partners Tpancpemontctpoj EAD and BIAC – M EOOD
Area:   106,830m²
Part:   Architecture and Constructions
GARAGE HALL: 
Characteristic features:– one-story three-nave hall
 – reinforced concrete prefabricated skeletal structural system
 – dimensions in plan – 171.5m / 67.7m
 - clear height to the lower edge of the main beam - from 6.10m to 6.45m
 – construction wheelbases – 12.2m / 20m, 23m and 24m
 – roof structure – pre-stressed roof beams, pre-stressed capitals, sheet metal
REPAIR HALL AND BOILER ROOM: 
Characteristic features:– one-story and two-story two-nave hall
 – reinforced concrete prefabricated skeletal structural system
 - dimensions in plan - 107m / 37.3m
ADMINISTRATIVE BUILDING: 
Characteristic features:– monolithic reinforced concrete, skeletal, beamless structural system
 - dimensions in plan - 48.25m / 18m
TRANSPORT PASSAGE: 
Characteristic features:- execution by open method in an unreinforced trench with slopes
 - two-hole, monolithic, closed, reinforced concrete structure - "box" type
 – light support distance – 8.25m
 - clear height - 4.65m
 – the facility includes a tunnel section and two ramps
 – total length of the facility – 168m
 – the track development of the depot passes over the structure
OTHER:– car wash
 – sink for trains
 – gas station
 – parking lot
 – street network
Degree of completion:   in operation since 2019

Gallery

Start typing and press Enter to search