Breakthrough of the water palace - a two-level transport junction for the connection of Bul. "Tsar Boris III the Unifier" and Bul. "Maritsa-south" city of Plovdiv

Investor / Employer:   PLOVDIV MUNICIPALITY
Main contractor:   ISA 2000
Chief Designer:   BIAS-M Ltd
Facility length:   180 m (40 m underpass)
Facility width:   8.50 m
Built-up area of the facility:   1,840 m2 
Main construction material:   reinforced concrete
Technology and features:   • Tunnel part – External main structure of slotted walls and roof plate, performed on the "Top-Down" terrain and internal reinforced concrete structure
· Ramps - strengthening with secant piles, walls and an internal trough-shaped concrete construction 