Breakthrough of the water palace - a two-level transport junction for the connection of Bul. "Tsar Boris III the Unifier" and Bul. "Maritsa-south" city of Plovdiv

Investor / Employer: | PLOVDIV MUNICIPALITY |
Main contractor: | ISA 2000 |
Chief Designer: | BIAS-M Ltd |
Facility length: | 180 m (40 m underpass) |
Facility width: | 8.50 m |
Built-up area of the facility: | 1,840 m2 |
Main construction material: | reinforced concrete |
Technology and features: | • Tunnel part – External main structure of slotted walls and roof plate, performed on the "Top-Down" terrain and internal reinforced concrete structure |
· Ramps - strengthening with secant piles, walls and an internal trough-shaped concrete construction |