Section MIII - MC - 15 to MIII - MC 16 - Mizia/NBU

Metro extension project in Sofia, Third metro line - Blvd. "Botevgradsko Shose" - Blvd. "Vladimir Vazov" - Central part of the city - residential complex "Ovcha Kupel" stage II with four metro stations; separate position No. 2 - near MC 18 with 2 metro stations - working shaft for the implementation of TU according to NATM

Investor / Employer:   METROPOLITAN MUNICIPALITY / "METROPOLITAN" JSC
Architecture:   BIAS-M EOOD, architect Evangelina Sirakova
Main contractor:   METROBUILD ZAPAD ASSOCIATION
Facility length:   900 m
Part:   Complex design
Technologies and features:    – metro tunnel built by the Top-Down method on slotted walls, monolithic reinforced concrete
 - ventilation system (VU) - partly Top-Down, partly open method, monolithic reinforced concrete
 – a tunnel section built in an open method from monolithic reinforced concrete
Degree of completion:   in operation from 2021