Production hall in the village of Dagonovo
Fruit and vegetable processing enterprise, s. Dagonovo, community Belitsa, region Blagoevgrad
Investor / Employer: | BIOORGANIC BULGARIA LTD |
Architecture: | PROGRESS PERFECT DESIGN LTD |
Main contractor: | DRY BUILDING LTD |
Construction dimensions (in plan): | 60 / 45 m |
Floors (above ground): | 2 pcs. |
Part: | Constructions |
RZP: | 2,300 m2 |
Strengthening a construction trench: | exposed unreinforced trench with slopes |
Main construction material: | monolithic reinforced concrete, steel-reinforced concrete, structural steel |
Construction system / Type of construction: | skeleton - steel frames (columns and beams) + intermediate steel-reinforced concrete slab |
Construction wheelbases: | 12 / 6 m |
Foundation: | flat - monolithic, single and strip foundations, united by a "grill" of randbalki |
Roof: | gable of structural steel |
Degree of completion: | in operation since 2018 |