Production hall in the village of Dagonovo

Fruit and vegetable processing enterprise, s. Dagonovo, community Belitsa, region Blagoevgrad

Investor / Employer:   BIOORGANIC BULGARIA LTD
Architecture:   PROGRESS PERFECT DESIGN LTD
Main contractor:   DRY BUILDING LTD
Construction dimensions (in plan):   60 / 45 m
Floors (above ground):   2 pcs.
Part:   Constructions
RZP:   2,300 m2
Strengthening a construction trench:   exposed unreinforced trench with slopes
Main construction material:   monolithic reinforced concrete, steel-reinforced concrete, structural steel
Construction system / Type of construction:   skeleton - steel frames (columns and beams) + intermediate steel-reinforced concrete slab
Construction wheelbases:   12 / 6 m
Foundation:   flat - monolithic, single and strip foundations, united by a "grill" of randbalki
Roof:   gable of structural steel
Degree of completion:   in operation since 2018