MIII – MC10 – NDK II

Extension of the Metro in Sofia; Third Metro Line - Depot "Bul. "Botevgradsko Shose" - Blvd. "Vladimir Vazov" - Central City Part - J.K. "Ovcha Kupel". First stage - from km. 4+950 to km. 11+966.34 by separate position #2: Section from km 8+996.69 (end of MC11) to km 6+561.05 (end of MC8) with 3 pcs. metro stations
Investor / Employer: | METROPOLITAN MUNICIPALITY / "METROPOLITAN" JSC |
Architecture: | arch. Evangelina Sirakova, BIAS-M EOOD |
Main contractor: | DZZD United Metro Build Center |
Facility length: | 219.8 m. |
Facility width: | 18.4-19.6 m. |
Facility Depth / Height: | 18.5 – 20 m. |
Part: | COMPLEX DESIGN |
Built-up area of the facility: | 3232 sq.m. |
Strengthening of a construction trench: | slotted walls |
Construction technology: | Top-down |
Main construction material: | monolithic reinforced concrete |
Degree of completion: | in operation since 2020 |