MIII – MC9 – St. Patriarch Euthymius

Extension of the Metro in Sofia; Third Metro Line - Depot "Bul. "Botevgradsko Shose" - Blvd. "Vladimir Vazov" - Central City Part - J.K. "Ovcha Kupel". First stage - from km. 4+950 to km. 11+966.34 by separate position #2: section from km 8+996.69 (end of MC11) to km 6+561.05 (end of MC8) with 3 pcs. metro stations.

Investor / Employer:   METROPOLITAN MUNICIPALITY / "METROPOLITAN" JSC
Architecture:   arch. Evangelina Sirakova, BIAS-M EOOD
Main contractor:   DZZD United Metro Build Center
Facility length:   219.8 m.
Facility width:   18.4-19.6 m.
Facility Depth / Height:   18.5 – 20 m.
Part:   COMPLEX DESIGN
Built-up area of the facility:   3232 sq.m.
Strengthening of a construction trench:slotted walls
Construction technology:   Top-down
Main construction material:   monolithic reinforced concrete
Degree of completion:   in operation since 2020