ЕТАП 1 – ЖИЛИЩНА СГРАДА С ГАРАЖИ И ПОДЗЕМНИ ГАРАЖИ В УПИ V-1978, КВ. 6, М.“МАЛИНОВА ДОЛИНА“, ГР. СОФИЯ
ЕТАП 2 – ЖИЛИЩНА СГРАДА С MАГАЗИНИ И ПОДЗЕМНИ ГАРАЖИ В УПИ- II-1972,1976, КВ.6, М.“МАЛИНОВА ДОЛИНА“, Р-Н СТУДЕНТСКИ, ГР. СОФИЯ
ЕТАП 3 – ДВЕ ЖИЛИЩНИ СГРАДИ, ПОДЗЕМНИ ГАРАЖИ И ШАХТОВ ТРАФОПОСТ В УПИ VIII-1975,1976, КВ.54, М.„МАЛИНОВА ДОЛИНА“, ГР. СОФИЯ

Client:"FAIRPLAY PROPERTIES" REITs
Architecture:"CASTILLIA" Ltd.
Main contractor:"FAIRPLAY CONSTRUCTIONS" Ltd.
BUILDING 1 (Stage 1) 
Plan dimensions:41 / 19,5 m
Stories (overground):8
Basements:1
Design:Structures; Health & Safety Plan; Construction Waste Management Plan
CGA - Construction Gross (building) Area:5 200 m2
Excavation with retaining structure:"Berlin wall" - soldier (RC & steel) piles and timber lagging
Main structural material:reinforced concrete
Structural type system:skeleton-frame structure - columns, shear walls and flat slabs
Structural grid spacing:7,2 / 6,25 m
Foundation:mat foundation with slab thickness of 70 cm
Roof - type & material:flat reinforced concrete slab
Phase/stage:in operation since 2017
BUILDING 2 (Stage 2) 
Plan dimensions:46,5 / 41,5 m
Stories (overground):8
Basements:1
Design:Structures
CGA - Construction Gross (building) Area:13 000 m2
Excavation with retaining structure:1.) "Berlin wall" - soldier (steel) piles and timber lagging
 2.) cast in place reinforced concrete piles
 3.) soil nail shotcrete slope
Main structural material:reinforced concrete
Structural type system:skeleton-frame structure - columns, shear walls and flat slabs
Structural grid spacing:6,4 / 6,25 m
Foundation:mat foundation with slab thickness of 70 cm
Roof - type & material:flat reinforced concrete slab
Phase/stage:in operation since 2017
BUILDINGS 3 & 4 (Stage 3) 
Plan dimensions:66,5 / 57,5 m
Stories (overground):6
Basements:1
Design:Structures
CGA - Construction Gross (building) Area:17 100 m2
Excavation with retaining structure:"Berlin wall" - soldier (RC & steel) piles and timber lagging
Main structural material:reinforced concrete
Structural type system:skeleton-frame structure - columns, shear walls and flat slabs
Structural grid spacing:6,5 / 6,5 m
Foundation:mat foundation with slab thickness of 60 cm
Roof - type & material:flat reinforced concrete slab
Phase/stage:in operation since 2018
×