Extension of the Metro in Sofia; Third Metro Line - Depot “Botevgradsko Shosse” Blvd. - “Vladimir Vazov” Blvd. - Central City Part - Ovcha Kupel. First stage - from km. 4 + 950 to km. 11 + 966.34 on separate position №2: section from km 8 + 996.69 (end of MC11) to km 6 + 561.05

Client:   SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
Architecture:   arh.Evangelina Sirakova, BIAS-M Ltd
Main contractor:   DZZD Union Metro Build Center
Facility length:   219,8 м.
Facility width:   18,4-19,6 м.
Facility height (depth):   18,5 – 20 м.
Design:   COMPLEX DESIGN
Built-up Area (BUA):   3232 кв.м.
Strengthening of construction excavation:diaphragm walls
Building technology:   "Top-down"
Main structural material:   reinforced concrete
Phase/stage:   in operation since 2020
×