Metro extension project in Sofia, Third Metro Line - “Blvd. Botevgradsko Shosse - Vladimir Vazov Blvd. - Central part of the city - "Ovcha Kupel", First stage - from km. 4 + 320 to km. 4 + 950 with one metro station

Client:   SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
Architecture:   ENGPROJECT LTD
Main contractor:   TRACE GROUP HOLD LTD
Facility length:   122 m
Facility width:   18 m
Facility height (depth):   12.5 m
Design:   CONSTRUCTION
Built-up Area (BUA):   2200 m2
Building technology:   "Top-down"
Main structural material:   reinforced concrete
Characteristics:    - 3 blocks, separated by expansion joints
 - external bearing and reinforcing structure - slotted walls and roof plate
 - internal (interior) construction - walls, columns, slabs and beams
 - side platforms - 2 pcs
 - entrances / exits - 2, northern entrance - under the river
Phase/stage:   in operation since 2020
×