Project for extension of the metro in Sofia, Third metro line - Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central part of the city - Ovcha Kupel residential area, stage II - from km. 11 + 941.33 to km 15 + 749.00 with four metro stations; separate position № 2 - section from km 14 + 277.56 to km 15 + 749.00 (near MC 18) with 2 metro stations - working shaft for implementation of TU under NATM at km 14 + 603.9363

Client:   SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
Architecture:   BIAS-M Ltd, arh.Evangelina Sirakova
Main contractor:   METROBUILD WEST ASSOCIATION
Facility length:   450 m
Design:   COMPLEX DESIGN
Technology and features:    - bridge facility over the Vladayska river - 2 openings L 40, width 50 m, monolithic reinforced concrete on slotted walls
 - open section with ramps - monolithic reinforced concrete
 - metro tunnel - open method in a trench fortified with slotted walls
Phase/stage:   in operation since 2021
×