Extension of the Metro in Sofia; Third Metro Line - Depot, Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central City Part - Ovcha Kupel. First stage - from km. 4 + 950 to km. 11 + 966.34 by separate position №2: Section from km 8 + 996.69 (end of MC11) to km 6 + 561.05

Client:SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
Architecture:arh.Evangelina Sirakova, BIAS-M Ltd
Main contractor:DZZD Union Metro Build Center
Facility length:219,8 м.
Facility width:18,4-19,6 м.
Facility height (depth):18,5 – 20 м.
Design:COMPLEX DESIGN
Built-up Area (BUA):3232 кв.м.
Strengthening of construction excavation:diaphragm walls
Building technology:"Top-down"
Main structural material:reinforced concrete
Phase/stage:in operation since 2020
×