Project for extension of the metro in Sofia, Third metro line - Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central part of the city - Ovcha Kupel residential area, stage II - from km. 11 + 941.33 to km 15 + 749.00 with four metro stations; separate position № 2 - section from km 14 + 277.56 to km 15 + 749.00 (near MC 18) with 2 metro stations - working shaft for implementation of TU under NATM at km 14 + 603.9363
Client: | SOFIA MUNICIPALITY / "METROPOLITEN" Jsc. |
Architecture: | BIAS-M Ltd, arh.Evangelina Sirakova |
Main contractor: | METROBUILD WEST ASSOCIATION |
Facility length: | 108 m + entrances |
Facility width: | 18.40 m |
Facility height (depth): | 13 m |
Design: | Complex design |
Built-up Area (BUA): | 2000 кв.м |
Building technology: | Top-Down on slotted walls |
Main structural material: | reinforced concrete |
Characteristics: | - three separate blocks |
- pedestrian underpasses | |
- 5 entrances | |
Phase/stage: | in operation since 2021 |