MIII - MS9 - St. Patriarch Euthymius
Extension of the Sofia Metro; Third Metro Line – Depot, Botevgradsko Shose Blvd. – Vladimir Vazov Blvd. – City Centre – Ovcha Kupel district. First stage – from km 4+950 to km 11+966.34, lot No. 2: section from km 8+996.69 (end of MC11) to km 6+561.05 (end of MC8) with 3 metro stations.
- Client
- SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
- Architecture
- arch. Evangelina Sirakova, BIAS-M Ltd.
- Main contractor
- Consortium Metro Build Center
- Facility length
- 219.8 m
- Facility width
- 18.4-19.6 m
- Facility height (depth)
- 18.5 – 20 m
- Design
- Complex design
- Built-up Area (BUA)
- 3232 sq.m
- Excavation with retaining structure
- diaphragm walls
- Building technology
- "Top-down"
- Main structural material
- reinforced concrete
- Phase/stage
- in operation since 2020