Excavation with retaining structure – 50 Slivnitsa, Varna
- Client
- EDELWEISS INVEST Ltd.
- Main contractor
- POLIMERINJECT Ltd.
- Plan dimensions
- 25/27 m
- Excavation depth
- 10.4 (11.5) m
- Basements
- 3
- Design
- Structures
- Excavation with retaining structure
- Berlin wall with two rows of supports
- Phase/stage
- Completed